You are here: Home / Referanser / 3D pump scan for Enhanced Drilling
The Field Service Department has completed an assignment for Sea Launch in Malaysia. The end shields were disassembled, the brush rocker rings were repaired, all the brushes were replaced and adjusted, the motors were cleaned and two of the DC propulsion engines were replaced.
Sea Launch
Karsten Moholt was given the task of creating a complete Ex register for the new rig COSL Pioneer. The project involved controlling and registering all Ex rated motors and equipment. Karsten Moholt was also given the responsibility for maintaining the Ex equipment.
COSL Pioneer
The best way to avoid breakdowns is by constantly monitoring the condition of motors and gears. Regular overhauls in a workshop are expensive and time-consuming.
Online Vibration